PIPELINE PREPARATION

Precision Preparation. Stronger Rehabilitation.

Professional pipeline preparation combines CCTV inspection, mechanical descaling, hydro-jetting, and targeted surface cleaning to remove buildup and prepare existing pipes for trenchless CIPP lining and epoxy rehabilitation.

THE METHOD

Our Three-Step Pipeline Preparation Process

Initial CCTV Assessment

Mechanical Descaling & Cleaning

Surface Preparation & Verification

We inspect existing pipes to identify visible damage, corrosion, scale buildup, and obstructions, helping determine the preparation required before rehabilitation.

Specialized mechanical tools and hydro-jetting remove hardened scale, corrosion buildup, grease, and debris to improve internal pipe conditions.

Targeted mechanical profiling and final CCTV inspection help verify pipe cleanliness, identify remaining defects, and assess readiness for CIPP lining or epoxy coating.

01

02

03

PREPARATION STANDARDS

Preparing Pipes for Rehabilitation

Surface Cleaning & Profiling

Pre-Lining CCTV Verification

Targeted mechanical cleaning removes remaining deposits and prepares the host pipe surface according to the requirements of the selected rehabilitation system.

A follow-up camera inspection documents visible pipe conditions, identifies remaining obstructions or defects, and helps determine whether additional preparation is needed before rehabilitation.

A Better Pipeline Starts with Proper Preparation.

Proper pipeline preparation is essential for successful trenchless rehabilitation. RELINEX combines CCTV inspection, mechanical cleaning, and surface preparation to assess existing pipe conditions and prepare pipelines for CIPP lining or epoxy coating.